Ramsey King
Petroleum Engineer with a Data Science Interest
Education
Master of Science, Data Science Dec 2020-Jun 2022 Bellevue University, Bellevue, NE
Bachelor of Science, Electrical Engineering Aug 1997-May 2002 Clemson University, Clemson, SC
Technical (Data Science)
Python | R |
Power BI | Spotfire |
Technical (Oil and Gas)
OpenWells | ProdView | WellView |
Cygnet | Spotfire | OilField Manager |
Rodstar | ARIES | TotalRod |
Experience
Endeavor Energy Resources
Technical Engineer: Mar 2022-present
- Project Lead for ProdView Software final phase and post implementation.
Production Engineer: Nov 2019-Mar 2022
- Identified, documented, and executed production optimization opportunities for approximately 400 wells in Martin and Dawson Counties, TX.
- Provided technical support to multiple disciplines including field operations, geology, reservoir, completions, land, and drilling.
Apache Corporation
Production Engineer: Dec 2013-Nov 2019
- Prepared over 100 workover AFE’s including multiple artificial lift installs, recompletions, and refracs.
- Lead monthly failure review meetings to help identify opportunities for increased production.
- Facilitated waterflood operations in Winkler County, TX.
- Lead annual field reviews to identify, document, and execute production optimization opportunities for approximately 400 wells in Glasscock County, TX.
- Mentored recently graduated engineers to help them learn the job functions of a Production Engineer.
Anadarko Petroluem Corporation
Well Operations Engineer: Oct 2012-Dec 2013
- Prepared over 80 workover AFE’s and procedures including plug and abandonments, remedial cementing, wellhead replacements, and production packers to support Wattenberg Horizontal Completions program
- Provided technical support and financial analysis to 15 workover rigs to control costs, enhance efficiency, and ensure safe operations.
- Supervised workover rigs on approximately 30 wells with operations including P&A’s, fishing, plug drill outs, wellbore cleanouts, gas lift installations, and wellhead changes.
Production Engineer: Nov 2019-Mar 2022
- Provided artificial lift design, troubleshooting, and optimization for approximately 1000 wells.
- Prepared approximately 100 AFE’s and procedures to enhance the production of vertical wells, including wellbore cleanouts, tubing repairs, and commingles.
- Organized and lead annual lease reviews to help identify, document, and execute production improvement opportunities for approximately 1000 wells.
Completions Engineer: Sep 2008-Apr 2011
- Prepared over 350 AFE’s and completion procedures including new well completions, re-fracs, and recompletes to stimulate multiple formations in the Wattenberg field.
- Recommended stimulation design enhancements based on post completion analysis.
- Oversaw approximately 250 vertical stimulations such as slickwater, gel, nitrogen.
Activities
- Church Leadership Assistant: 2017-present
- Bowling League: 2014-2016
- Flag Football League: 2009-2013
- Missionary for The Church of Jesus Christ of Latter-Day Saints: Philadelphia, PA 2003-2005